The Indian Midland Railway of the 1890s

This is from a map found on the net:

Ypu can download it from https://www.flickriver.com/photos/124446949@N06/49078963546/

Otherwise you can refer to the cropped portions below.

IMR cropped

The blue color indicates the IMR and the orange indicates the GIPR.

More basic history can be seen here:

https://wiki.fibis.org/w/Indian_Midland_Railway

The IMR was short-lived and existed only from 1885 to 1900 when it was absorbed by the GIPR. This particular map seems to be from the 1890s.

The station presently known as Bina was then known as Etawah or Itawa. Note the other old spellings such as Cawnpoor.

We can also see that the Agra-Mathura-Delhi line was not built yet. But one could go from Agra to Tundla and then to Delhi. Indeed, during the 1890s the GIP trains from Bombay to Delhi did follow this route.

And the BBCIR had not advanced much from Baroda towards Delhi. But it was also a regular practice for travelers from Bombay to Delhi to travel to Ahmedabad and then by MG to Delhi.

This box item from the IMR map has some points of interest:

IMR box item

It lists out the lines which existed then, including “Etawah” to Saugor, i.e. Bina to Saugor, though the extension to Katni was completed later.

The “Comparison of Distances” provides insight into the rivalry of different companies connecting the same pairs of cities. In later years the BBCI and GIP kept trying to show that their services between Bombay and Delhi/Punjab were better. This ended only when the railways were regrouped to form the WR, CR etc in the early 1950s.

Here we see that the IMR route from Bombay to Kanpur was shortest, :

1.  Via Jhansi-Kanpur 830 miles (1336 km) which is the standard route today

2.  Via Itarsi-Jabalpur-Allahabad-Kanpur 964 miles (1552 km)

3.  Via Baroda, Ahmedabad-Delhi by MG, Delhi-Kanpur 1006 miles (1620 km)

And similarly for Bombay to Agra:

1.  Via Jhansi-Agra 830* miles (1336 km) which is the standard route today

* So Jhansi-Agra and Jhansi-Kanpur are the same distance?

2.  Via Itarsi-Jabalpur-Allahabad-Tundla-Agra 1123 miles (1808 km)

3.  Via Baroda, Ahmedabad-Bandikui-Agra by MG 849 miles (1367 km)

Once the BBCIR got going and completed the Baroda-Mathura section by around 1910, they clearly had a shorter route between Bombay and Delhi.

The GIPR and EIR met at Jabalpur (Jubbulpore in those days). By the 1920s the Allahabad-Jabalpur section was transferred to the GIPR.

Some jokes from those days:

GIP stood for “Great Improvement Possible”

BBCI stood for “Beastly, Bad and Cannot Improve”

Then there were “Bribes Never Refused”, “Mails Slowly Moving” and “Sambar Idli Railway” which you should be able to guess.

However, the EIR escaped these nicknames.

The oldest fast trains in India, and other topics for fans of the Indian Railways

Some generalities to start with. There is no firm answer to the question “Which was India’s first long-distance train?” The present Railway administration seems to have decided that the Punjab Mail from Mumbai CSTM to Ferozepur is the oldest, having started its run from Bombay VT  to Lahore in 1912.

While the dates of opening of different sections of track are well documented by the railways (with a full directory up to 1964), the date of introduction of trains is not so clear unless one looks at the old timetables, which are generally not accessible to the public. Anyway, some of the oldest trains would include:

Bombay-Poona Mail: probably soon after the line was opened in 1863. Was known to be running in 1869. However, the name vanished around 1971 when it became the Sahyadri Express to Kolhapur with the same timings between Bombay and Poona (which were yet to become Mumbai and Pune)

Madras-Bangalore Mail: probably soon after the line between these cities was completed in 1864. At that time it would have run between Royapuram (then the only terminus in Madras) and Bangalore Cantt (likewise for Bangalore). It would have started running from Madras Central after 1873 and from Bangalore City after 1882. It still runs on this route, although the stations are now Chennai Central and KRS Bengaluru.

Then there would be the Kalka Mail, which started as the Delhi-Calcutta Mail in 1866 soon after the last link of the Yamuna bridge was opened. At that time it would have run by the Sahibganj loop which was the only connection between Calcutta and the North then. It would have started running via the “main line” between Asansol and Kiul after 1871 and via the Grand Chord after 1906. And it would have been extended to Kalka after 1891. So this is also one of the oldest fast trains of India, despite the numerous changes of route. It is still running between Howrah and Kalka by the Grand Chord.

The Delhi-Karnal-Ambala-Kalka line was opened in 1891. Possibly the Kalka Mail ran via Delhi-Meerut-Saharanpur-Ambala at one time, as this longer route  had more commercial and military significance.

I am not actually sure when it started running via the Grand Chord, as that covered relatively unpopulated areas compared to the main line via Patna. This can only be answered definitely by seeing timetables from 1906 onwards. In the 1930 timetable of the North Western Railway the abstract timetables show it running via Patna. But in the 1935 Bradshaw it is running via Gomoh on the Grand Chord, where Netaji is supposed to have boarded it in 1941.

In the same way many of the older Mail trains would have started running soon after the routes were completed. Some which must  have started running in the 19th century include the Madras/Mangalore, Madras/Bombay, Bombay/Calcutta via Allahabad. By 1910 the Madras/Howrah and Bombay/Howrah via Nagpur would have started.

Some like the Punjab Mail from Bombay (1912), Frontier Mail (1928), and Deccan Queen (1930) are well documented, although the second one became the Golden Temple Mail in 1996.

The Delhi-Madras route never had a mail train. The last link between Balharshah and Kazipet was completed in the late 1920s in what was then the Nizam’s State Railway. This Grand Trunk Express ran for the first few months from Mangalore to Peshawar, then for a few months from Mettupalaiyam to Lahore and then settled to its long-term route from Madras Central to Delhi.

By the 1950s most trains from the West and South started terminating at New Delhi which had been a tiny station until it was expanded to be a station fit for a capital. Ultimately the GT  was extended to Delhi Sarai Rohilla a few years ago. A number of long distance trains suffered the same fate due to the lack of stabling lines near New Delhi and Delhi Jn.

And Sarai Rohilla is one of the most inaccessible rail terminuses in India’s major cities, though it gets good competition from Kolkata Terminus and (to a lesser extent) from LTT and Bandra Terminus in Mumbai. However, unlike in Mumbai and Kolkata many of these trains also have stops at New Delhi or Delhi Jn, so it does not affect reserved passengers that much. Those going towards Rajasthan and Gujarat may prefer the 2-minute halt at Delhi Cantt to the inaccessible starting point.

Most of the trains mentioned above have separate articles on Wikipedia and other sites like irfca.org . Some sources are reliable, others are not. Anyone who says that the Punjab Mail of 1912 is the oldest train is clearly wrong.

To come back to the original question, the oldest long-distance train running on (almost) the same route throughout the years is almost certainly the Chennai/Bengaluru Mail, though the management of the CR and the NR would not like to hear that.

A footnote: some old timetables of India (including pre-1947 India) can be seen here:

http://www.irfca.org/gallery/Heritage/timetables/

It is not very systematic as bits and pieces have been added by a large number of people. If you expect to see the full all-India timetables for a particular year you will be disappointed. Some attempt has been made to give the full timetables for a particular company or zone, for instance the NWR from a 1943 Bradshaw:

http://www.irfca.org/gallery/Heritage/timetables/nwrtt/1943/

and the Jodhpur railway, 2 pages from the same Bradshaw:

http://www.irfca.org/gallery/Heritage/timetables/Jodhpur1-1943.jpg.html

http://www.irfca.org/gallery/Heritage/timetables/Jodhpur2-1943.jpg.html

There are also a few pages from the NWR of 1930 and Assam Bengal Railway of 1929. But basically you have to find your own way in this site.

Another section of the irfca site which may interest you is:

http://www.irfca.org/~shankie/famoustrains/famtraindqn.htm

although this was prepared over a decade ago and all the information may not be accurate.

Some railfans have acquired soft and hard copies of old timetables by various means over the years. If you expect them to put up the scans of the full timetables of the past, it will not happen because either the books are bound in such a way that scanning is difficult, or the pages are too yellow and/or fragile, or they are the result of multiple photocopies and are not very legible (the ones mentioned above are examples of this).

Anyway, I have been requested to summarize the timings of the Kalka Mail and Frontier Mail over the years. Probably the best you can expect is a summary of timings at some important stations retyped here.

Follow this blog, there are many other topics such as aviation and cricket covered here.

 

DC traction on India’s railways-sidelights

Much has been written about the final days of DC traction in Mumbai, more specifically on the Harbour line from CSTM to Vashi which was the last holdout of this form of electrification on the Indian railways. This is not exactly true – the Kolkata metro will continue to be on 750 V DC indefinitely, and it is officially a part of the Indian Railways (unlike the other metro systems in Delhi and elsewhere).

At its peak, the 1500 V DC system in Mumbai covered these sections:

WR: Colaba to Churchgate to Virar

CR: CST Mumbai to Pune and Igatpuri via Kalyan

CST Mumbai to Mahim and then in parallel to WR up to Andheri

CST Mumbai to Kurla via Harbour branch and then to Mankhurd,Vashi and Panvel.

(Mankhurd was the terminus until the 1990s).

Diva-Vasai Road

(Apart from CR and WR, some lines of the Bombay Port Trust were electrified with DC as well).

A typical news item about the conversion of the last route:

http://timesofindia.indiatimes.com/city/mumbai/Harbour-line-trains-run-on-new-25KV-AC-traction-from-today/articleshow/51762468.cms

What most railfans may forget is that 3000 V DC existed on some routes out of Howrah for about a decade and 1500 V DC on one metre gauge route out of Chennai for several decades.

From an official IR publication of 1964, we can get the early history. It makes things simpler if we use the names of places which were prevalent at that time

The years of completion were:

Bombay VT to Poona and Igatpuri: 1930 (299 route km) on the Great Indian Peninsular Railway, predecessor of the CR

Churchgate to Virar: 1936 (60 route km) on the Bombay, Baroda and Central India Railway, predecessor of the WR.

Madras Beach to Tambaram: 1931 (29 route km, metre gauge) on the South Indian Railway, predecessor of the SR.

Howrah-Bandel-Burdwan

and Seoraphuli-Tarakeswar: 1958 (142 route km) on ER.

Coming back to Bombay, the VT-Reay Road section was opened in 1925 with electrification, as the 1 in 34 gradient at Sandhurst Road was felt to be an insurmountable obstacle to any other means of traction. Diesel traction existed but was not considered a serious option at that time.

Reay Road to Kurla had been running on steam since it was opened in 1910.The extension from Kurla to Mankhurd was completed by 1927 and was electrified in 1936.

The Karjat-Khopoli branch was one of the first lines opened in India (in 1856, when it became the railhead for Poona for some years). It seems to have been electrified only in the mid-90s and timetables of 1994 show diesel-hauled passenger trains on the CR main timetable (not the suburban timetable).

The Diva-Vasai Road line was built in the 1980s and was electrified with DC soon after it was opened.

On what is now the WR, electrification was completed to Borivli in 1928 and to Virar in 1936. Colaba was the terminus for long distance and local trains until Bombay Central was opened in 1930, and the lines between Colaba and Churchgate were electrified but this line itself was closed at the end of 1930. Churchgate has been the terminus for local trains since then.

The short stretch from Madras Beach to Tambaram was electrified at 1500 V DC in 1931. Apart from the EMUs on this route, long distance trains continued to run on steam from Madras Egmore. By 1967 the Tambaram-Villupuram section was electrified at the then standard voltage of 25 KV AC and the Beach-Tambaram section was converted to AC to enable through running up to Villupuram.

After independence, the first steps towards electrification of ER lines out of Howrah were taken with Howrah-Bandel-Burdwan and Seoraphuli-Tarakeswar being completed by 1958. These too were converted to AC in the mid-60s, and virtually all subsequent electrification in India was at 25 KV AC. The only exceptions were the extensions from Mankhurd to Vashi and then Panvel, Thane to Vashi and extensions,  and electrification of Karjat-Khopoli in the 90s which had to match the existing DC system in Mumbai.

Some of the DC locos from ER were converted to 1500 V DC and sent to CR, where they continued to serve for many years on the slopes of Bhor Ghat and Thull Ghat. Some EMUs were also converted and sent to WR and CR with mixed results.

More about DC locos, AC/DC locos and operational aspects to follow.